Project: TPP2 May 2014 Turnaround
Location: Lotte Chemical Titan (M) Sdn Bhd, Pasir Gudang
Job scope:
Dismantle 30units of equipment motor from site for reconditioning job & reinstall, realign, reconnect & testing commissioning.
Duration: 8 days
Project: Malaysian Sheet Glass Cold Repair JB2F 2015
Location: Malaysian Sheet Glass Sdn Bhd, Pasir Gudang
Job Scope:
- Service & overhaul for 25 units of Main Cooling Fan & Cooling Fan Motor for Furnace & Tin Bath.
- Installation 2 set of New Fan Set & Ducting Job
Duration: 21 days


Project: Upgrading of Automatic Silo System
Location: STO Sea Sdn Bhd, Seri Alam
Job scope:
- To upgrade the existing OPC, White & CC Cement automatic feed in & weighing system.
- To design & construct monitoring system for New Silo.
Duration: 12days
Project: Explosive Proof Wiring for New Loading System of New Storage
Location: NPBT, Johor Port Pasir Gudang
Job scope:
- Cabling job for Transfer Pump & Chiller System
- To design & construct Loading Bay Monitoring & Loading System for New Storage.
Duration: 20 days